• 215 hours
  • Constant tree removal throughout the year
  • Rock causeway (wet re-route) completed on White Trail
  • Pink blazing on Lumpy Bumpy
  • Extensive ‘brush-back’ at Deer Park and Tranquility side
  • Kiosk maintenance
  • Bridge repair on Allamuchy Pond Trail
  • Continued closing of rouge trail on the lower Red Trail
  • Lower Four Bump Alternate to Lumpy Bumpy (wet re-route) 75% complete

Tagged in :

Tom Avatar