- 215 hours
- Constant tree removal throughout the year
- Rock causeway (wet re-route) completed on White Trail
- Pink blazing on Lumpy Bumpy
- Extensive ‘brush-back’ at Deer Park and Tranquility side
- Kiosk maintenance
- Bridge repair on Allamuchy Pond Trail
- Continued closing of rouge trail on the lower Red Trail
- Lower Four Bump Alternate to Lumpy Bumpy (wet re-route) 75% complete
Tagged in :