Work Plan

Work In Progress (WIP)

Jointly-promoted JORBA/NYNJTC volunteer work trips are ongoing. Currently we are working on the section, called stags.

Work Planned


Work Completed

Stags an Accessible Connection from Cages to Tapawingo

Stags does not yet exist. Work starts 2022.

Stags


Stags will fix an unsustainable section of the legacy Hewitt-Butler trail connecting tanks and cages to Tapawingo. It will be NJ’s first accessible trail for adaptive riders. Please visit the Stags project page for more information.

The connection from Rhino to Tapawingo. The section is completed and opened and called Ryno.

The completed trail Ryno on Trailforks.com

Ryno


This will stack a loop on Rhino making the first connection to Tapawingo

Rhinoplasty

Rhinoplasty provides an easier direct route to Tapawingo.

Rhinoplasty will provide an easier direct route to Tapawingo as opposed to the more difficult Hungry Bird. Work will comense once the rest of the project is completed.


Taps New Trails

Lay out and build the new connector between existing Hewitt-Butler and woods road.

New Trail in Northern Norvin Green


Construction of a new connector trail segment, approximately two miles in length. This trail segment would be built in accordance with the “Best Practices” section of this document, including low-impact construction and a primitive trail tread only 18”-24” in width.

Taps does not yet exist but you can help JORBA build it.


Paiute Trout Trail

Work started on the Paiute Trout Trail in the fall of 2020. Eventually Paiute will be the main connection on Tapawingo between Long Pond Iron Works in the north and northern Norvin Green in the south. Work in Norvin Green is suspended as requested by NYNJTC.

Paiute Trout Trail


Work Started in the fall of 2020 to be completed with the new Taps trail.

Paiute Trout Trail on Trailforks.com

Work Completed

Place new blazes along existing trails and woods roads, as indicated in the maps that follow, to be used immediately with no trail work or construction needed.

Work Ongoing

In perpetuity: NYNJTC and JORBA will cooperatively maintain all trails depicted on the proposed final trail configuration map to standards consistent with other trails in the region. Please note that no part of this document constitutes anything beyond a recommendation, and that the estimated timeline above is not a commitment or obligation of any kind.


Background

Jungle Habitat


Jungle is predominantly mountain biking

Norvin Green


Traditionally Hiking

Connections


Existing route will be made sustainable with improved connections to Jungle Habitat and approximately two miles of new trail.

Approved with Conditions

2020.07.02 The land management review for the adoption of the existing trails, addition of the new and the installation of the bridge passed with conditions;

Freshwater Fisheries

BFF is ok with project but ensure fish passage at stream crossings and avoid approach of streams from steep slopes to minimize streambank erosion.

Historic Preservation Office

The HPO does not have a concern with the proposed project. However, based on the documentation submitted, the proposed project is located within an area of high sensitivity for archaeological resources. If archaeological resources are discovered during project implementation, please consult with the HPO.

Fish and Wildlife Endangered and Non-Game Species

If any trees  larger than 5″ DBH will be felled:

  • Bats: ENSP acknowledges the fact that the USFWS considers the project area as potential habitat for Indiana bat and recommends all cutting of vegetation/trees with > 5” DBH (using machinery and/or by hand/on foot) occur between October 1 and March 31 to minimize harm to roosting Indiana bats. This timing restriction (i.e., “no activity from April 1 through September 31”) represents the standard guidance the USFWS would provide via consultation. The ENSP strongly recommends this timing restriction be incorporated into the project-wide scheduling and/or that you “consult” with the USFWS field office, Alicia Protus (609-382-5266;Alicia_Protus@fws.gov) with regard to bat timing restrictions.
  • Woodland Raptors – Given the proximity of barred owl observations to the property boundaries and what appears to be potential suitable habitat on site, it is possible that barred owls and/or red-shouldered hawks or northern goshawks may be nesting on the property. Surveys should be conducted for presence/absence and for nest/cavity trees before any tree removal begins to minimize disturbance/harm to nesting birds.

2020.02.27 In Land Management Review, first round of questions


NYNJTC-JORBA Proposal for Long Pond Ironworks, Norvin Green, and Jungle Habitat Trail Network

This project was submitted for Land Management Review to NJDEP in the summer of 2019.

Peter Dolan, Christopher Connolly, Erik Mickelson, Tom Hennigan, Dave Van Wart, Arthur White

Connecting People, Places and Parks

Overview

The Jersey Off-Road Bicycling Association (JORBA) and the New York-New Jersey Trail Conference (NYNJTC) have collaborated to jointly propose a plan which aims to improve trail conditions and connectivity within the property formerly known as “Jungle Habitat” – referred to as the Mountain Biking Area in this document – as well as contiguous trails in Long Pond Ironworks State Park and northern Norvin Green State Forest. We seek to consult with Ringwood State Park personnel on defining and approving these recommendations, which will have minimal environmental impact due to their primary utilization of existing trails and woods roads under management of the Ringwood State Park office.

We believe that expanding both multi-use and hiker-only trail opportunities in the area will provide the following benefits:

  • Increase access to the region’s open and green spaces;
  • Boost economic activity for the region’s businesses by enhancing recreational opportunities proximal to town centers;
  • Facilitate greater connections to nature and recreation, promoting health, well-being and a stronger sense of stewardship for our natural environment;
  • Promote additional use of existing trails and engender support for their maintenance and improvement;
  • Ease navigation along currently-unmarked paths in the area, leading to less lost hiker incidents;
  • Bring more legitimate trail users to the area, discouraging the existing and prolific use of public land for illegal ORV riding and trash dumping.
  • Ease vehicle crowding seen at nearby trailhead parking areas.

In order to improve and maintain these trails, NYNJTC and JORBA will collaborate with State Park staff for all necessary approvals and permissions. On the following pages we present several photos which show what the existing “unmaintained trails” and “woods roads” look like on the ground. We wish to emphasize that most of the newly-adopted trails recommended in this document already exist and are already being used by people, with only trail blazes and occasional spot-fixes needed to make them easier to navigate for hikers and bikers.

About Us

The two groups collaborating on this document both specialize in volunteer-led trail work, from layout and design to construction and maintenance. Both have extensive histories executing projects alongside State Park partners, as well as other land management agencies.


Creating this Proposal

The photographs that follow were all taken during joint JORBA-NYNJTC scouting trips of the area in question. Nothing was suggested without first being explored on the ground, and the close spirit of collaboration ensures that any suggestions adopted from this proposal will have the support of both hiking and biking representatives.

Best Practices

Both JORBA and NYNJTC are well-versed in the art of sustainable trail design and construction. These skills are best utilized in the construction of brand-new trail, since older trails and woods roads often have significant layout problems that are difficult to remedy.

This proposal features only one new stretch of trail construction, located between the power line utility right-of way and the Burnt Meadow wetlands (see map on page 11, with area of interest shaded in yellow). This would be built in the vein of similar “primitive footpath”-style trails, with a tread surface of roughly 18”-24” in width. See images to the right and below for an approximation of what such trail looks like upon completion. Trails built correctly in this style are low-impact, cause minimal disturbance, and are easy to maintain by volunteers with hand tools.

Volunteers of NYNJTC and JORBA would conduct joint work trips to execute any new trail design and construction. Trail design would follow best-recommended practices of the International Mountain Biking Association (IMBA) and United States Forest Service to ensure sustainability of the natural trail surface. Trail design and construction would be carefully planned to minimize impact to the natural surroundings, and sensitive wetland areas would be avoided. The trail would be primarily developed through the use of hand tools such as rakes, picks and shovels, with any use of power tools discussed with and approved by the appropriate NJDEP personnel.

The majority of this proposal utilizes existing woods roads and unmaintained trails. These are already well-established on the ground and are already being used by people, so we seek only to have them marked and formally recognized for easier navigation. In some instances, the existing woods roads may have issues with water drainage or unsustainable paths directly up steep slopes. In such instances we would seek to relocate the trail as needed to briefly avoid the affected area, never going more than 200’ from the existing disturbed corridor before. Such changes would be so small as to be imperceptible on standard trail maps.

Best Practice Design Standards

Sustainable Trail…

  • Supports current and future use with minimal impact to the natural ecosystem.
  • Produces negligible soil loss or movement while allowing vegetation to inhabit the area.
  • Recognizes that pruning of certain plants may be necessary for proper maintenance.
  • Accommodates existing use while allowing only appropriate future use.
  • Requires little rerouting and minimal long-term maintenance.

The Five Essential Elements of Sustainable Trails – IMBA – 2004

  1. The Half Rule:
    A trail’s grade should not exceed half the grade of the hillside or side-slope that the trail traverses.
  2. The Ten Percent Average Guideline:
    Generally, an overall (average) trail grade of 10 percent or less is sustainable.
  3. Maximum Sustainable Grade:
    Although maximum sustainable trail is usually around 15 to 20 percent, it is site-specific and dependent
    on a number of factors – including: the Half Rule, Soil Type, Tread Make-up, Annual Rain/Snowfall,
    Grade Reversals, Types of Users, Number of Users, and Difficulty Level.
  4. Grade Reversals:
    A grade reversal is a spot at which a climbing trail levels out and drops subtly for 10 to 50 feet before
    rising again – water exits the trail tread at the low point of a grade reversal.
  5. Outslope:
    As the trail contours across a hillside, the downhill or outer edge of the trails tread should be slightly lower
    than the inside edge – by about five percent. Outslope encourages water to sheet across the trail rather
    than traveling down the trail’s center.

Implementation Steps


The following pages show several maps which help to illustrate the existing trail configuration, proposed trail changes, proposed final trail configuration, and a detailed look at the proposed final trail blazing in the northern Norvin Green area. By necessity, the maps embedded in this document are small. High resolution PDFs can be found in the attachment sent alongside this digital document. Implementing all of the recommendations will not take place overnight. Below is a very rough timeline of when we might expect certain implementation actions to take place.

  • 0-6 months after approval: Place new blazes along existing trails and woods roads, as indicated in the maps that follow, to be used immediately with no trail work or construction needed.
  • 6 months – 1 year after approval: Organize jointly-promoted JORBA/NYNJTC volunteer work trips to execute spot fixes and minor relocations (within 200’ of existing trail) along areas of need, focusing on the multi-use blue Tapawingo Loop. Use these work trips, along with public workshops, to recruit people and build the local volunteer base.
  • 6 month – 2 years after approval: Upon receiving final permissions, lay out and build the new connector between existing Hewitt-Butler and woods road.
  • In perpetuity: NYNJTC and JORBA will cooperatively maintain all trails depicted on the proposed final trail configuration map to standards consistent with other trails in the region. Please note that no part of this document constitutes anything beyond a recommendation, and that the estimated timeline above is not a commitment or obligation of any kind.

Mountain Biking Area (Jungle Habitat) Blazes

The map depicting the proposed final trail blazing in the Mountain Biking Area was crafted based on the recommendations of experienced mountain bikers who are intimately familiar with the existing trail network. While stacked loop trail systems are preferred, in the case of the Mountain Biking Area they are not feasible due to negative control points that limit the placement of the trails allowing only point to point travel. However, even without loops the network of trails provides a variety of options and choices for users to enjoy the park.

Trail Use Designation

Currently, all trails in Norvin Green State Forest State Park are designated for hiker use only. After extensive discussion, both JORBA and NYNJTC have agreed that the Tapawingo Trail Loop seen in the proposed final trail configuration should be designated as a multi-use trail suitable for both hikers and bikers. This greatly expands the biking opportunities available from the Mountain Biking Area by added a 5.25-mile loop for those seeking a longer ride. Much of the Tapawingo Trail Loop is repurposed woods road, and already suitable for bicycle use. Preserving the hiker-only designation of all other adjacent trails in Norvin Green and Long Pond Ironworks ensures that there are opportunities available for people seeking that experience.

Significant Projects

While most of the recommendations in this plan will have little or no direct impact on the ground beyond mounting new markings and addressing drainage problems on existing paths, two projects will need additional review. The first is the construction of a new connector trail segment, approximately one mile in length. A potential route is shown below. This trail segment would be built in accordance with the “Best Practices” section of this document, including low-impact construction and a primitive trail tread only 18”-24” in width.

The second is a bridge 41.10848, -74.33774, the center of the red shaded circle in the image above. The channel is deep and both banks are stable parts of an existing woods road, making material delivery and installation relatively straightforward. A pre-engineered and prefabricated truss bridge as seen below, approximately 40’ in span, would be the ideal solution for this site. We seek the Park’s assistance in acquiring any necessary permits and will in return assist with funding and installing the bridge.

Changes to Existing Trails

The Hewitt-Butler Trail, at one time, connected the northern and southern parts of Norvin Green State Forest. Braen Quarry currently severs the trail and it exists in disjointed segments. While the Hewitt-Butler trail could be preserved in its current state, our proposed final trail configuration shows the trail removed from northern Norvin Green and Long Pond Ironworks. This removal is in recognition of the fact that most modern hikers prefer loops, as reflected in this proposal, and relatively few modern hikers seek to follow the Hewitt-Butler route. In addition, removing the Hewitt-Butler results in less “co-blazing,” the practice of having multiple trail markings on the same tree, which can be confusing when done in excess. We recommend that the portion of the Hewitt-Butler south of West Brook be retired, and up to the Manaticut Point Loop be re-blazed pink as an extension of the West Brook Connector. Through the rest of the trail network, the blue Hewitt-Butler blazes should be removed or repurposed as part of the blue Tapawingo Trail Loop.