Wildcat Ridge WMA Bridge Repair 7/18/21

Volunteer Opportunity Sunday July 18th 8:00 AM JORBA is working in cooperation with the NYNJ Trail Conference and the NJDEP Division of Fish and Wildlife to repair a bridge within the Wildcat Ridge WMA trail system. There is a substantial amount of lumber that needs to be carried from the boat launch at Splitrock Reservoir to…

Wharton State Forest Basto Area MTB Trail Maintenance

Volunteer Trail Maintenance is done under the supervision of Wharton staff. Maintenance includes: brush backs, blowdown removal and trail tread repair. Please bring water, gloves, suitable footwear and a sense of humor. You will be required to complete and sign a waiver. Trail tools will be available. These Scheduled Volunteer Maintenance Days run 9:00 AM…

Ringwood Dirty Thursdays are Back

We are planning to start working on Thursdays for the re-route project for Cooper Union North.Folks can join us trail side between 4:00pm and twilight. Our worksite will be located at the intersection of Stateline trail and Cooper Union Trail. Parking, closest parking option is Eagle Valley Pond, or Long Meadow/Sloatsburg Rd. Intersection. 4pm on Thursday until dark, wear sturdy shoes…

Lewis Morris Trail Work

Morris County Parks and NY-NJ Trail Conference is ready for volunteers this Saturday (19th) and Sunday (20th). Volunteers should be prepared with plenty of water, lunch/snacks, sturdy pants, closed toed shoes, and rain gear. We will provide PPE and tools. To sign up, volunteers can email morrisco@nynjtc.org. 

Stephens Trail Maintenance 6-12-21

Hello all, Stephens Trail Maintenance – J.O.R.B.A. 6-12-21 Saturday 8:30am – 12:30pm Meet at the Pink trail head by rail road crossing and do brush back. 97 Waterloo Valley Rd.Budd Lake, NJ 07828 https://www.google.com/maps/place/97+Waterloo+Valley+Rd,+Budd+Lake,+NJ+07828/@40.899163,-74.7756697,17z/data=!4m5!3m4!1s0x89c39d56b48b53f3:0x115db95164ee3e07!8m2!3d40.899159!4d-74.773481 Bring yourself, water, gloves (I’ll have some gloves if you need) BUG SPRAY and a snack. Rain cancels. ********Please rsvp via…

National Trail Day Build at Jungle

We will be out, and with enough volunteers putting finishing touches on the connection between Rhino and Tapawingo. Please sign up in advance, we’ll need to know how much swag to bring, and how much BBQ to order. Saturday June 5th. 9:00 at the gate, we’ll drive up and park in the lot and and…